News

What you need to pay attention to when installing and commissioning the air shower room

What you need to pay attention to when installing and commissioning the air shower room

I. Installation

1. The air shower room should be installed on the horizontal ground, and the floating dust particles concentration value should be low and no fluctuation in the area;

2. The centrifugal fan has been equipped with a vibration damper, and the air shower room does not need to be shock-absorbing in general condition.

3. When assembling, first lay the base plate flat, so that there is no gap between the shell and the middle of the shell, followed by the ground foot bolt tightening connection.





II. Commissioning



Test run before checking

1. Check the wind shower room parts are not intact and installed solid, centrifugal fan and motor tight fit is not moderate.

2. The centrifugal fan base damper fixed card is not disassembled.

3. Ensure that all parts are kept clean, especially the primary, high-efficiency air supply outlet, etc., the box must not have dirt.

4. Check the shell and the middle of the shell closed rubber are not destroyed and fall off, sealing is not excellent.

5. Three-phase power supply voltage and wiring are not by the provisions of the grounding device is not good.





Test run

1. Check whether the display light is bright, and the power switch is normal.

2. Start the light method, and check the air shower centrifugal fan steering is not appropriate, If there is a mistake should be immediately shut down to replace the phase line, so that the centrifugal fan is turning. When the start-up light is no abnormality, can be put into trial operation 1 time, and shut down. No abnormality again debugging.

3. Accurately measure the starting current of the wind shower room with a clamp meter, and the operation current is not normal.

4. Observe the centrifugal fan, and motor operation of the starting current, the operating current is not normal.





After the installation of the wind shower room use process is summarised below:

Open the door - into the stainless steel air shower room - door closed - automatic magnetic induction blowing shower - side door open - people out of the stainless steel air shower room - the back of the people open the door - so the cycle continues.


In the process of the air shower room front and back doors are locked situation, and internal personnel can not be forced to open, them to prevent the destruction of the locking device. If you encounter an emergency, please press the emergency stop button to stop working.