German French Italian Portuguese Japanese Korrean Russian
Home

News

What steps are required to build an efficient cleanroom purification facility?

What steps are required to build an efficient cleanroom purification facility?

     In all the air purification filters, the use of clean rooms is undoubtedly more, especially in some of the high hygiene requirements of the production field is more so, and we use these devices without considering them in the construction of what specific steps are needed.
1, indoor cleanliness and temperature and humidity requirements.
2, the number of users, area, ceiling height, main beam height, etc..
3, the need to produce the type and characteristics of the product.
4, the indoor use of equipment, heat production, moisture production, and exhaust air volume.
5, the location of the host and whether there is a need for branding.
6, the situation of the indoor ground, whether there are anti-static requirements? Is the ground level? Quotation, etc.; 7, the indoor lighting facilities are good.
7, indoor lighting facilities are good.
      After these basic issues have been resolved, we can base these matters on the construction of the clean room:
1, first of all, to determine whether the meteorological index of the city is suitable for construction.
2, to determine the indoor cold load index, the cold load mainly includes structural cold load, personnel cold load, fresh air cold load equipment cold load, etc.; 3, calculate the indoor cold load required for the supply and demand of the clean room.
3, the calculation of indoor air volume, according to the relevant provisions of the volume of the clean area multiplied by the number of air changes can be, where the volume of the clean area should we consider the equipment and indoor columns occupied by the space? This is not considered in the general construction;
4, when the determination of the cold load and wet volume of these data, you can use the ID map to draw.
5, will be obtained by adding all the load values, according to this cold load data to select the type of equipment.
     It can be seen that the steps of building cleanroom purification equipment are quite complete and complex, we need to follow these provisions step by step, so that there can not be any problems, otherwise, the construction of the equipment will not have the original effect.