German French Italian Portuguese Japanese Korrean Russian
Home

News

What are the installation steps and requirements for filtration equipment?

What are the installation steps and requirements for filtration equipment?

I. The priority step is to choose suitable equipment according to the need of the products to be produced in the purification workshop and the number of personnel, etc. Attention should be paid to the sealing degree of all kinds of purification equipment when it is connected to the enclosure of the clean room.

II. The installation process of the fan filtration unit and air purification equipment in purification equipment should meet the following requirements:

1. The fan filtration unit or air purification equipment should be installed in a clean site and remember to inspect its appearance, without deformation, rust, or breakage.

2. If it is a high-efficiency air filter, a leak test should be carried out first before installation, and it should be installed only after passing.

3. Be sure to pay attention to the direction of installation can not be wrong, the installation should pay attention to whether it is easy to repair.

4. After the installation of the fan filter unit is completed, the overall level should be maintained, and the ceiling is well connected.

5. In the test run of the system, a temporary medium-efficiency air filter must be added to the air inlet.

III. If the airlock room with fan, air shower room, and the ground should be set up between the corresponding vibration isolation pad, to do flat and stable, and clean room enclosure before with appropriate.

IV. The installation of one of the transfer windows should conform to the relevant requirements of the design drawings and product instructions, and the installation should be firm, keep vertical, and the connection should be sealed and processed.

V. In the case of clean laminar flow hoods, the following requirements should be met:

1. An independent boom should be set up with anti-swaying fixing measures.

2. When the laminar flow hood is installed on a suspended ceiling, the hood should be sealed around the ceiling.