Modular quick-install operating rooms double the benefits.
Modular quick-install operating rooms double the benefits.Modular quick-install operating rooms are quickly installed and formed in modular form, transforming complex operating rooms and medical clean space projects into customizable industrial products. They are prefabricated into the entire operating room space, greatly shortening the construction period and construction difficulty and effectively reducing engineering costs.After two generations of updates, the third generation of modular quick-install operating rooms has shown significant technological progress. Only 4 people are needed to complete the installation within 1 day. This efficiency improvement is due to its modular design and optimized assembly process. When assembled in strict accordance with the manufacturer's requirements, the cleanliness of this operating room can reach the 100-level standard, which meets the cleanliness requirements of the "Technical Specifications for Hospital Clean Operating Room Construction" (GB50333-2013). This level of cleanliness can effectively reduce the postoperative infection rate, improve the success rate of surgery, and provide patients with a safer and cleaner surgical environment. First, the structure of the modular quick-install operating room is mainly composed of common unit core components. The operating room structure includes an air supply ceiling, door frame, footing foundation, columns, beams, and other infrastructure components. Foshan Zhongjing's production specifications are mainly based on using film-coated board materials for the entire wall. The entire wall is assembled with high-quality film-coated board materials. The arc tee in the main structure is sprayed with a cold-rolled steel plate, which has a simple structure and is convenient for construction. Secondly, the modular quick-install operating room has many characteristics that are favored by the user units, especially in the following points: 1. Standardized module assembly for easy transportation The modular assembly is formed by standardized products, and the closed wall is quickly installed, which is easy to install. The overall component module combination is easy to transport and construct. 2. Prefabrication process, short construction period The prefabricated components are assembled as a whole, which can effectively shorten the construction period. To install an operating room of the same size, it takes 10-14 days for 4 people to construct using the first-generation technology, 4-8 days for 4 people to construct using the second-generation technology, and only 1 day for 4 people to construct using the third-generation modular quick-install technology. 3. Digital integrated system control of the operating room Integrate the main instrument control systems in the operating room, comprehensive integration and compatibility integrated digital control. 4. Stable and durable, environmentally friendly materials The materials used are laminated boards, which are easy to transport and maintain. The main pillars are sprayed with environmentally friendly steel plates, which are sturdy and durable. 5. Overall beauty and easy cleaning The overall installation is beautiful, the gaps are tightly combined, the laminated board material is not easy to scratch, and the wall installation is easy to maintain afterward, without causing other dust, or environmental problems. Finally, the modular quick-install operating room installation plan is very simple and clear at a glance. The overall construction can be completed according to the following installation steps. The overall construction period can greatly shorten the construction period compared with similar unit specifications, at least it can reach only 20~30% of the construction period. The general installation steps only require the installation of the foundation in the early stage and the leveling of the ground for building the structure; then, install the overall structure skeleton support surface, and install other clean equipment according to the reserved positions, including reserved places for air ducts, air inlets and outlets, instrument settings, etc. Finally, install the assembled laminate combination, integrate the walls, and use glass glue and other materials for splicing. During the process, no other dust and other hygiene problems will be generated, and it is easy to maintain later. |