How to decorate a clean room main steps

How to decorate a clean room main steps

Determine the renovation program and offer, and sign a contract is generally to see the site first, many programs are required based on the site, as well as the workshop production of products planned. Different industries of the workshop on the decoration needs are not the same, the level of engineering standards will be different, and the price will be different. Understand the purification workshop decoration level, area, ceiling, and under the beam, good to have drawings. Convenient later design, but also save time, determine the price of the program, and sign a contract to officially start construction.

Ground engineering

What ground is suitable for the use of floor paint, floor paint construction seasonal precautions, temperature and humidity how, and how long after the completion of construction can enter, it is recommended that owners can learn about it in advance.

Color steel plate interval installation

That is, the general framework, such as materials in the field, will be all the partition wall is good, time by the plant area to determine. Purification workshop decoration belongs to the general framework, after the material into the field, will be all the partition walls, and the time is determined by the plant area. Purification workshop decoration belongs to the industrial plant decoration, generally faster, unlike the decoration industry, the period is slower.

Ceiling

Factory purification workshop after the installation of the interval is to install the ceiling, this should not be ignored. A ceiling will be installed on the equipment, such as filters, purification lamps, air conditioning, etc. Hanging screws and plate spacing should be by the provisions. Reasonable layout to avoid unnecessary trouble later.

Equipment and air-conditioning devices

Purification of the industry's main equipment: filters, purification lamps, air intake, air shower room, air conditioning, and so on. Equipment is generally slower and needs time to make spray paint. After signing the renovation contract, pay attention to the time of the equipment in the field. After this step, the workshop device is complete