German French Italian Portuguese Japanese Korrean Russian
Home

News

Details of the installation and use of clean equipment in the production of environmental protection

Details of the installation and use of clean equipment in the production of environmental protection companies

I. Installation

1, the equipment should be installed by the specific rules of use in all levels of the purification plant or air-conditioned plant;

2, the installation location should be far away from high-speed dust sources, vibration sources, etc.;

3、After the installation is completed, the interior of the equipment and the surrounding environment must be carefully cleaned;

4、After installation and cleaning, you can use a professional electric anemometer to measure the average wind speed in the clean area and adjust the voltage of the equipment until the average wind speed of the equipment is kept within an ideal range before use.

II. Use

1, the equipment should be used in advance of 30 minutes to open one of the ultraviolet germicidal lamps, which will need to purify the micro-organisms in the area removed, 20 minutes later to close the germicidal lamp, start the fan;

2, do not put unnecessary items on the table where the equipment is placed, to keep the clean airflow in the area undisturbed;

3, regularly use the professional electric anemometer to measure the average wind speed in the area, if not in line with the provisions of timely adjustment, so that the bench is always in a better operating condition.

III. Maintenance

1, according to the use of environmental cleanliness of the equipment for regular cleaning, the cleaning interval is generally 3 - 6 months;

2、If the voltage of the air unit in the equipment has been adjusted to large, but the average wind speed in the area still can not reach the technical parameters, it is necessary to replace the high-efficiency filter;

3, when replacing the filter, first open the pre-filter at the top of the air supply body and remove the fan plate;

4, after the replacement, you should first use the dust meter to check whether the equipment around the seal is good, and adjust the voltage of the air unit, so that the average air speed remains within a certain range;

5. All AC power must be cut off before installation and replacement to avoid danger.