     No matter what kind of equipment, using the correct installation is a necessary step, and we today install the air filter as an example, and you come together to see what must pay attention to matters!
     First, the entire air system installation, construction, and acceptance procedures should be in line with the current national standards.
     Second, the equipment is by the factory packaging on the sign of the direction of placement, in the process of transport, especially to prevent violent vibration and collision.
     Third, when the equipment is transported to the installation site, before unpacking it should be placed in a cleaner room to store and pay attention to moisture.
     Fourth, the equipment to be installed should hold a product certificate of conformity, open the box in a tidier environment, after opening the box should be attached to the internal and external surfaces of the equipment to wipe the dust and dirt, and after the opening of the box should be installed promptly.
     Fifth, before installation, should be by the packing list for a one-by-one check: to see whether the equipment has no missing parts, surface damage, or rust, and check whether the internal parts are firmly connected.
     Sixth, in general, the installation should be in the building, and purification system construction should be completed after the construction, and the internal aspects of cleaning, wiping;
     Seven, the installation of equipment on the ground should try to keep it flat, and after the installation of equipment in place should keep the vertical axis vertical and horizontal axis level.
     Eight, if it is installed in a clean room with a fan, then the equipment and the ground should be padded between the vibration isolation layer to protect the equipment.
     Nine, if there is a mechanical interlock or electrical interlocking equipment, installation, and commissioning should ensure that the interlock is in a normal state.
     Ten, where the fan of the equipment in the installation should be completed after the fan test run test, test run when the impeller rotation direction must be by the standard, and test run time by the relevant technical requirements of the equipment to decide, if there are no relevant provisions of the words should not be less than 2 hours.
     The above ten points are we analyze for you on the correct installation of air filters, this simple equipment as an example is to facilitate better familiarity and understanding, to help you better use these filtering equipment!