A few key considerations for installing air equipment in cleanrooms

A few key considerations for installing air equipment in cleanrooms

In many industrial productions, a clean room has been one of the pieces of equipment that can not be missing to ensure safe production, and the use of a clean room, efficient air filter, and key equipment, so today we come to introduce the installation of air filter considerations, come together to see if it is usually easy to ignore the aspects of it!

1, the entire air system installation, construction, and acceptance procedures should be in line with the current national standards;

2, air equipment by the direction of the outer packaging mark on the factory for placement, in the process of transport, especially to prevent the emergence of violent vibration or collision;

3, air equipment shipped to the installation site, before unpacking it should be placed in a neater room storage, and pay attention to moisture;

4, the equipment to be installed should hold a product certificate of conformity, the unpacking should be carried out in a neater environment after the unpacking should be wiped off the dust and dirt attached to the internal and external surfaces of the equipment, and after the unpacking should be installed promptly;

5、Before installation, the equipment should be checked one by one according to the packing list: check whether there are any missing parts, whether the surface is damaged or rusted, and whether the internal parts are firmly connected;

6、Under normal circumstances, the installation should be carried out after the construction of the building interior and purification system is completed, and the interior should be cleaned and wiped in many aspects;

7、The ground where the equipment is installed should be kept as flat as possible, and the equipment should be kept vertical in the longitudinal axis and horizontal in the horizontal axis after it is installed in place;

8, if it is installed in a clean room with a fan, then the equipment and the ground should be padded between the vibration isolation layer to protect the equipment;

9, if it is with mechanical chain or electrical chain equipment, after installation, commissioning should ensure that the interlock is in a normal state;

10, where there is a fan of the equipment after the completion of the installation of the fan should be a test run test, a test run when the direction of rotation of the impeller must be by the standard, and a test run time by the relevant technical requirements of the equipment to decide if there is no relevant provisions should not be less than 2 hours.

These ten aspects are the precautions we have introduced to you for the installation of air equipment, we have made a detailed analysis for you from matters such as the transport of air filters from the factory to the installation of different clean rooms, and we hope to play a role in the actual work to help.